Design Review
The technical design review for phase 1 of the ZFS crypto project.
- Review period: 2007-07-02 through 2007-07-16
- Review Document
- Project Plan
How to participate
- Join zfs-crypto-discuss mail alias on opensolaris.org or post to the Jive forum.
- Send comments ONLY to that alias; please do not send private email this is an open design review. Please do NOT cross post review comments to any other alias.
- Optional: Telephone Conference 2007-07-11 (Wednesday)
- 1500 GMT
- 1600 Europe/London
- 0800 US/Pacific
- CALL COMPLETED DIALIN INFORMATION REMOVED
What type of comments are expected
- Phase 1 features only, unless you believe design choices being made in this phase will prohibit implementation of future features.
Note that upgrade between encrypted phase 1 datasets and later phases is desireable but not mandatory since phase 1 functionality will continue to be supported.
- Implied or actual user interface
- Missing information
- Invalid or dubious assumptions being made
- Above all "Keep it technical". Where possible separate editorial (spelling, grammar etc) comments separate from technical ones.
on 2009/10/26 12:18